APP Users: If unable to download, please re-install our APP.
Only logged in User can create notes
Only logged in User can create notes

General Studies 3 >> Science & Technology

audio may take few seconds to load

SSLV-D2

SSLV-D2

1. Context

In its second development flight slated for February 10 morning, the Small Satellite Launch Vehicle (SSLV-D2) will place the Indian Space Research Organisation (ISRO) earth observation satellite EOS-07 and two co-passenger satellites- Janus 1 and AzaadiSat2 developed by start-ups in a 450-km circular orbit around the Earth.
The mission of ISRO's smallest vehicle scheduled for 9.18 am will last only 15 minutes. It will be ISRO's first launch of 2023.

2. The Aim of the launch

  • The new vehicle was developed to capture the emerging small and microsatellite commercial market, with launches offered on demand. 
  • The rocket can be assembled by a small team in only a few days, compared to the six months and around 600 people it takes for ISRO's workhorse PSLV.
  • The plan is to make it available in a week the assembly can be done in two days, (followed by) two days of testing and in the next two days, are doing the rehearsal and launch already done this time.
Image Source: ISRO

3. Second attempt at a launch

  • The launch vehicle uses three solid stages followed by a liquid-fuel-based Velocity Trimming Module (VTM) to place satellites in orbit.
  • The vehicle's first development flight which took place last August after repeated delays due to the pandemic failed to place the satellites in a precise orbit.
  • This was because of excessive vibration sensed by accelerometers during the second stage separation, which made the onboard system "think" that the sensors were faulty.
  • For the second flight, structural changes have been made to the equipment bay, along with changes in the separation mechanism for stage 2 and logic changes for the onboard system.
  • A new vehicle is declared operational by the space agency after it completes two successful development flights.
  • The last vehicle to be declared operational was the GSLV MkIII, now called LVM 3, When carried Chandrayann-2 in 2019.

4. About Janus-1

  • Janus-1 technology demonstrator satellite built by United States-based Antaris and its Indian partners XDLinks and Ananth Technologies.
  • The creation of a standardised satellite bus on which multiple payloads can be attached just like lego blocks.
  • This will enable companies to quickly and cheaply launch their payloads.
  • Once launched, we can handle the operations for them or give the companies access to our platform so that can control it.
  • A satellite bus is the main structure of a satellite on which the payloads can be used for multiple applications such as earth observation, signal monitoring or ship tracking rest.
  • The company aims to make satellite buses of different sizes, for satellites weighing around 100kg.
Janus-1 which weighs only 10.2 kg, is a six-unit cube satellite with five payloads on board two from Singapore and one each from Kenya, Australia and Indonesia.
The entire satellite was built in 10 months, less than half the time it usually takes to manufacture satellites of this size.

5. About AzaadiSat 2

  • The payloads have been built by 750 girl students from across India.
  • A similar satellite by SpaceKidzIndia was launched aboard SSLV-D1 in August last year.
  • The payloads remain the same LoRa amateur radio, a sensor to measure radiation levels in space and sensors to measure the health of the satellite such as temperature, reset count and intertidal data but this second satellite has an additional feature.

6. Space Awareness Programme

  • SpaceKidzIndia which aims to promote space awareness among children has made the satellite expandable: the 8-unit satellite will have a spring mechanism-based external frame which will open up once the satellite is in orbit.
  • After the frame opens up, the satellite will become four times its size.
  • This external frame will host a new cheaper type of solar panel to provide energy to the satellite.
  • Energy for sustaining longer durations in space is one of the challenges of small satellites, which is why we have made the structure expandable. This is the first time such a thing is being tried out.
  • The small size at the time of launch with a bigger power pack means the satellite will easily fit in the launch vehicles and start-ups will spend less on launch services.
  • One hundred and fifty of the 750 students developed some of the payloads.
  • The satellite will also carry the G20 logo to space and the NCC song to celebrate 75 years of the organisation.
  • The space song is about girl children and students of rural India dreaming of becoming space scientists has been composed by Devi Sri Prasad.

For Prelims & Mains

For Prelims: ISRO, SSLV-D2, NCC song, G-20, SpaceKidzIndia, earth observation satellite EOS-07, Janus 1,  AzaadiSat2, PSLV, Velocity Trimming Module, space song, 
For Mains:
1. What is Small Satellite Launch Vehicle (SSLV-D2) and discuss its benefits. (250 Words)
2. What is Velocity Trimming Module and discuss the Space awareness programmes in India. (250 Words)
 
Source: The Indian Express
 

Share to Social